Our Favorite Beetle : "TAZ "
CURRENT MILEAGE:
Shop at BestPrices.Com!
Engine Installation
Translate this page
using FreeTranslation.com
READ THE MANUAL FIRST!
You will need a FLAT surface to complete
this repair for your safety.
READ ALL OF
THIS PROCEDURE SEVERAL TIMES SO THAT YOU UNDERSTAND IT. DO NOT
PERFORM THE PROCEDURE OUT OF ORDER. THIS WILL RESULT IN DEATH
OR SERIOUS INJURY.
Read our
Safety page
too.
We have available
for download the complete procedure on our
DOWNLOADS page
TOOLS NEEDED:
Flat Blade
screwdriver
8,10,13,17, 19 mm
wrench
8,10,13,17,19mm
socket 3/8 or 1/2 inch drive
1/2 or 3/8 drive
ratchet
Engine dolly (not
required but VERY helpful)
Floor Jack (4000
lbs. capacity)
2 jack stands
2 Wheel Chocks
Tire iron or "Tire
Star"
Clutch Alignment
Tool or a Pilot Shaft
A second person
(very helpful, but not required)
Procedure for Installation
Slide the engine under
the VW.
Slowly raise the engine
to be even with the transmission.
Install the two lower
nuts from the transmission to engine. Then install the upper two
Bolts. Torque bolts
Add new engine oil using
the Oil Change
procedure (Steps 5 - 9 only)
Be sure to reconnect all
electrical connections on the engine.
Lower up the VW
using Lowering
Procedure .
Reconnect Negative and
positive Battery terminal connections as shown on
Battery
Installation .
After filling with 3
quarts of oil, START the engine.
Check for leaks, under
the VW and around the engine.
Page last
updated:
Tuesday, 16 September 2008 18:07:47 -0500
remote web site uptime and availability monitoring tool
If you are having problems seeing images
on this site, see
If you have suggestions for topics. please
email me at
Topics
If you have Questions: email me at
Questions